For a one-off intervention defined by the community.
Work orders for communities
Every intervention, controlled from start to finish.
Onzane brings the origin, planning, supplier, deadlines, communications, evidence, validation and financial closure of the work together in one order.
An operational record
Create. Assign. Execute. Validate. Close.
Each stage preserves owners, dates, decisions and evidence so work can be followed without scattered conversations.
-
01
Create
Define the scope from an incident, asset, plan or specific need.
-
02
Assign
Choose staff or supplier, priority, dates and service commitments.
-
03
Execute
Record progress, blockers, communications, time and evidence.
-
04
Validate
Review the result and approve or return it with a traceable reason.
-
05
Close
Reconcile the award, final cost and invoices before locking the record.
Six ways to start
Work begins where the need arises.
An order can be created directly or preserve the context of its source, linking it to the issue, space, asset, offer or plan.
Turn a validated report into operational work.
Place the work in an entrance, room or common area.
Preserve equipment, history, warranty and documents.
Carry over the approved scope, supplier and amount.
Automatically generate each recurring execution.
Lifecycle
Statuses that explain what is happening.
From draft to closure, every transition reflects a real action and records who performed it.
- 01Before execution
Draft, awaiting quote, awarded and scheduled.
- 02During the work
In progress or blocked, with reason, owner and next action.
- 03After execution
Completed, validated, cancelled or reopened with a reason.
Shared execution
The supplier works in the same flow.
The supplier panel replaces disjointed exchanges: the company receives the scope, coordinates dates and documents what happens.
Confirm the assignment or explain why it cannot be accepted.
Agree on the visit without losing sight of the target commitment.
Record waits for parts, access or community decisions.
Attach photos, documents, measurements and comments.
Submit the result so the community can validate it.
Service commitments
Deadlines stop being an invisible promise.
Onzane can monitor different times by priority, contract or work type and highlight exceptions before they become breaches.
- Order acceptance time
- Time to propose or confirm planning
- Maximum resolution time
- Warnings, escalations and queues by risk
Result control
Completing does not mean automatic approval.
The community can require evidence and a checklist before accepting the work. If something is missing, it returns the order with a specific reason.
Photos, documents, readings or signatures depending on the work.
Explicit criteria to review scope and result.
The order returns to the supplier with the reason and audit trail.
Financial closure
The final cost is also part of the work.
The order connects the awarded amount, approved variations and received invoices so operational and financial closure tell the same story.
- 01Compare
Contrast the awarded offer, final amount and invoiced documents.
- 02Explain differences
Document extra materials or work before accepting the cost.
- 03Lock or reopen
Close the record and require a reason for later changes.
Frequently asked questions
Work orders in Onzane.
How each intervention is created, coordinated, validated and closed.
01What is the difference between an incident and a work order?
An incident records a problem or report. A work order defines the operational intervention needed to resolve it, with an owner, planning, statuses, evidence and closure. One incident can create one or more orders.
02Where can a work order come from?
It can be created manually or from an incident, location, asset, awarded offer or maintenance plan that generates recurring executions.
03Can an external supplier work on the order?
Yes. The supplier can accept, propose dates, start, block, resume and complete the work, and provide updates and evidence from its panel.
04Can service-level agreements or SLAs be monitored?
Yes. Onzane can measure acceptance, planning and resolution times by contract, priority or work type, with warnings and escalations.
05What happens if the result is not correct?
An authorised person can reject validation and state the reason. The order returns to the relevant operational status and keeps the decision in its history.
06Can photos or documents be required?
Yes. The order can define mandatory evidence and a checklist that must be completed before requesting validation.
07How are invoices linked to the work?
Financial closure compares the awarded amount, final cost and linked invoices. Differences must be explained before closing the record.
08Is the history preserved if the manager or supplier changes?
Yes. Statuses, communications, owners, evidence, validations and costs remain in the community context for authorised users.
Traceable operations
Turn every intervention into a controlled process.
We help you configure work types, statuses, owners, SLAs and validation criteria that fit your community.